DMADV for Six Sigma
Define Measure Analyze Design Verify
QI Macros can help you create all of the charts and tools in DMADV.
Go Deeper: DMADV is the step-by-step method for developing new products or processes, or revolutionizing existing products that do not meet customer needs:
- Define the the product or process to be developed
- Measure baseline performance KPIs (Key Performance Indicators)
- Analyze the options for producing the best product at the lowest cost.
- Design, test and optimize the process to deliver customer requirements
- Verify the ability to deliver those customer requirements
Most Commonly Used DMADV Tools in QI Macros | ||||
Define | Measure | Analyze | Design | Verify |
---|---|---|---|---|
Project Charter |
Control Chart | QFD | Design of Experiments | Control Chart |
Voice of the Customer | Histogram | FMEA | TRIZ | |
Critical to Quality (CTQ) Measures | Pareto Chart | Prioritization Matrix | Action Plan | |
Less Frequently Used DMADV Tools in QI Macros | ||||
Box and Whisker Plot | Cause/Effect Matrix | Control Plan | ||
Flowchart |
MultiVari Chart | Design of Experiments | ||
Gantt Chart | Scatter Plot | |||
SIPOC Diagram | Checksheet | Gage R&R (MSA) | ||
Stakeholder Analysis |
||||
Tree Diagram | ||||
Work Breakdown Structure | ||||
Statistical DMADV Tools in QI Macros | ||||
Descriptive Statistics | Hypothesis Testing |
|||
ANOVA | ||||
Chi-Squared | ||||
t Test | ||||
Regression Analysis | ||||
Non-Parametric Tests |