Add Target or Goal Lines to Control Charts

home · products · services · search · view cart · contact  
 
  NAVIGATION        
 

Jay Arthur
888-468-1537
303-756-9144
KnowWare International, Inc.
DBA LifeStar

2253 S. Oneida
Ste 3D
Denver, CO 80224


We work with companies
that want to fire up their profits using
Lean Six Sigma

Copyright © 2011



 

Control chart sigma lines and upper control and lower control limits are calculated from your data. However, many customers also want to show a show a target or spec limit line on their control chart. If you created a chart using a control chart macro in the QI Macros this can be accomplished in one of several ways:

  1. Use the QI Macros Add Target Line to Chart tool on the Chart Menu (available October, 2011). It will prompt for a name for the line and a value and add the line to the chart. Add as many lines as needed. This will work on most charts, but not pie or radar charts:


  2. Use Excel's drawing tools to simply draw a target line on your existing control chart.
    • To view Excel's drawing toolbar select View/Toolbars and check the box next to "Drawing."
    • Next simply draw a line on your chart.
    • You can use the text box feature on the drawing toolbar to add a label to the line.
    • Note: If you add data to the chart you may need to re-synch up the line.
  3. Add target data line to the chart.
    • Go to the intermediate spreadsheet created when you ran the control chart macro.
    • Create a new column in your intermediate data sheet and label it "target" or "goal."
    • Input your target value in every row that you have data. For example, if you have 25 data points on your control chart and your target value is .150, input ".150" in the first 25 rows of your column titled Target.

    add target line to control chart

    • Click and drag over the title and target data and select Edit/Copy. Then go to the chart and select Edit/Paste to add the target line to the chart.
    • Since the target line data is linked to the chart, it will move with the chart if new data is added or if the x and y axis change.

In the p, u, XbarR, XbarS charts, Excel may use the "no line" format of other lines on the chart as a basis for formatting the target line. To show the target line, click on the chart, Then Chart Tools-Layout-Chart Area pull down menu and select Target:

Select hidden Excel chart series

Then Click on Format Selection, then Line Color and select solid line and a color:

Format hidden Excel chart series

Control Chart With Target or Goal Line

Here is an example of a control chart with a Target Line shown at .150 on the chart, just below the upper control limit.

If you still can't see the target line, it may be because your X axis is a date or number. To reveal the line:

1. Right click on the chart and choose Select Dat:

2. Select Target and Choose Edit:

3. Clear the Series X values and Click OK:

QI Macros Control Chart Menu Features

Add Target or Goal Line to Chart

Other QI Macros and Control Chart Articles

 

Download the FREE 30-day Evaluation copy of the QI Macros Excel SPC Software for Six Sigma

 
Macintosh
PC
QI Macros - One License Per Computer
- Download Now and Get Backup CD & User Guide (#230) in 1-3 days - $199 + S&H
QI Macros - One License Per Computer
- Download Only - No Shipping or Customs Duties (#W230) $199


If you love the QI Macros...
Please ask a handful of friends to download the trial version. Here's what to say:
Need easy to learn, easy to use software for Lean Six Sigma and SPC that works right in Microsoft Excel? Test drive the QI Macros!
Find out more at www.qimacros.com/excel-spc-software.html.
Get a 30-day trial at www.qimacros.com/free-spc-software.html.

Going to a meeting of quality professionals?
We can send you as many QI Macros 30-day trial CDs as you need. Just send an email with the address and quantities needed to orders@qimacros.com.

 
FREE
Lean Six Sigma Course
& QI Macros 30-day Trial
Name:
E-mail
How did you hear about us? *

We hate spam as much as you do, so we never share your email with anyone for any reason.

Download
QI Macros

30-Day Trial Now!


Or Buy It Now!

Unconditional
90-Day
Money-Back
Guarantee


 
home | products | services | search | sitemap | view cart | contact
QI Macros | Excel SPC Software | SPC Software Free Trial
Control Charts | c Chart | np Chart | p Chart | u Chart
ImR Chart | XmR Chart | XMedianR Chart | XbarR Chart | XbarS Chart | EWMA Chart
Anom Chart | Cusum Chart | Levey Jennings Chart | Moving Average Chart
Histograms | Pareto Chart | Scatter Plot | Run Chart
Box Whisker Plot | Dot Plot | Multivari Chart

Lean Six Sigma Training | Lean Six Sigma Training Denver
Lean Six Sigma Consulting | Lean Six Sigma Consulting Denver
Lean Six Sigma Training Systems | Do-It-Yourself Lean Six Sigma Training